跳至主要内容

How to Calculate Price Per Square Foot for House Painting

Estimating is one of the most important skills a house painter can have. Bid a project too high, and you will likely lose the contract. Bid too low and you may not make money. Different painters use different methods of estimating, including hourly rates. Square footage remains the most popular means of estimating, but learning to calculate the price per square foot can be challenging.

Add the results for each type of painting (walls, ceilings, etc.) together for the entire project. Do not add different types of painting together, as each type is generally priced separately. You should now have the total square footage of the walls, ceilings, floors and decks, the total linear footage of the trim and the total number of doors.

Measure each room, for interior painting or a section of the exterior, separately. Within each area, measure each type of painting (walls, ceilings, etc.) separately. To save time, measure the length of each wall and add the lengths together. Then multiply the total by the height. The result is the square footage of the walls in that room. Ceilings, floors, decks and fences are also measured by square foot. Multiply the width by the height.

Trim pieces such as baseboards, door casings and crown molding are measured in linear feet. Measure the length of each separate piece and add the results together. Do not multiply by the width of the piece. Doors are usually priced as an individual unit, doubled if you will paint both sides of the door.

Consult a written painting price guide to determine the average price per square foot or linear foot in your area. Prices vary dramatically between regions, so look for a guide designed for your state. Price guides are available online. Write down the average price for each type of painting and multiply that price by the measurements you took. Add the totals together for a rough estimate of the total cost of the job.

Prepare a piece of scrap paper. Make separate sections or columns for walls, floors, ceilings, trim, doors and any special areas such as decks or fences. If the project spans multiple rooms, leave plenty of space in each column.

Consider the difficulty of the proposed job. If the job is standard, a 20 percent markup is common to account for unforeseen circumstances. Consider marking up particularly difficult jobs by another 10 or more percent. Likewise, if the job is particularly easy or fun, consider marking the price down a bit.

Difficulty: Moderate

评论

此博客中的热门博文

How to Design a Store Front Sign

In this Article we will talk about designing a store front for a business. What color or size should your Letters & designs be? What to put on your sign and why?, then be ready to Get in touch with sign people and get your best deal. Large lettering with out a front sign could save you time and money Do your products have a special shape or color to emulate on your sign? Kodak is always in yellow and black, Coca-Cola white on red, Etc. Muffler places, have a sign in the shape of a muffler. your phone number on the store front some place, but not on the identification sign, (door, or window) Your Product & logos can be arranged on the front sign, or window. Not on the Pole sign, Store hours & phone number could fit in your design and by using the product color, it could add product recognition & enhance your design. Suppliers may provide plenty of advert...

Can Microsoft and Yahoo Co-Create New Businesses?

Negotiating The Future of Management Podcast Current Interactive Case Study Respectfully there's a parallel in modern history here. China-HongKong merger. It started as Two System One China. Controversial at that time. Now, many don't mind which system is better (respectfully just an opinion). Both are getting the best of each other under one country. Families are reunited regularly. Corporate identities sometimes focuses too much on what's different as a strategy. It may provide superiority, but does it always guarantee sustainability? Nature advocates the flourishing of various species; pursues diversity not for purposes of destruction but for better adaptability. Of the whole system. Being different doesn't mean one must separate oneself from the "whole" system. "Different" here is to provide a unique contribution to pserve the "whole". Task / role distribution , not identity separation. Preserving the whole system by b...

找到一个可以替代ghs.google.com的地址

用Goole Blogger的自定义域名功能需要用到 ghs.google.com 做CNAME,或者用ping ghs.google.com 得出的IP做一个A记录.但是,伟大的GFW已经把 ghs.google.com 和部分IP屏蔽在大陆之外.这样的壮举使得我们的自定义域名不能正常访问,或者让你的网页背景.图片被滤掉,精心做成的模板变得惨白不堪. 那么,我们可不可以找一个替代 ghs.google.com 的地址呢?当然能.因为Google是强大的.它有许多有用的IP地址让你去探寻. 对 ghs.google.com 分析研究后发现, ghs.google.com 这台服务器并没有提供实质性的服务,而只是选择访问者访问最快的服务器(Google全球性公司,很多地区都有服务器).我们只要找到其他服务器的IP地址,并且这个IP地址没被屏蔽,那么就成了. 寻找这样的IP地址需要用到tracert命令.即在CMD模式下输入:tracert ghs.google.com ,在已经屏蔽的当下,最后自然得不出结果,这就需要我们使用代理了.使用不同地区的代理运行tracert ghs.google.com 命令. tracert ghs.google.com 的最后一跳会有类似这样的域名: eh-in-f121.google.com 如果在不用代理的情况下,你能ping通这个域名,那么恭喜你,你找到了!现在就可以用这个域名代替 ghs.google.com 设置你的CNAME了,ping出的IP地址可以做A记录,CNAME和A记录,只做其中之一就可以. hs-in-f121.google.com 64.233.179.121 eh-in-f121.google.com 72.14.207.121 bx-in-f121.google.com 66.249.81.121 ik-in-f121.google.com 66.249.91.121 这4个在我所在地区不能使用,而可以使用 tw-in-f121.google.com 72.14.235.121 或者209.85.171.121也可用 下面是一些不断更新的:74.125.43.121 除了使用代理来寻找,也可以通过一些网站提供的功能来寻找这个地址,很方便,就是使用网站提供的Traceroute.这些网站有: h...